Earthworks

Stabilisation of landslip, Dudley

Project duration: 13 weeks.
Project Overview:

• Clear unstable slope of trees, and setting out benches
   based on geo-survey
• Nail unstable slope to secure against further movement.
• Form contiguous pile wall at base of slope, with capping
   beam, and sprayed concrete finish.
• Hydroseed reinstated slope.
• Make good damage to building impacted by landslip.
Back
Next
Drainage

Dudley, West Midlands
Project Overview:

• Sewer connection for shop floor and offices
• Access for production maintained at all times
• Course of existing utilities established
Car Parks

Construction of car park, Wednesbury, West Midlands

Project duration: 10 weeks.
Project Overview:

• Prepare and excavate 2,500 sq. mtr. parking area.
• Lay drainage, water attenuation system, bypass
   interceptor and hydro brake.
• Prepare base, apply surfacing, and line marking.
• Lay kerbs, fencing, lighting & alarm ducting,
   and landscape surrounds.
Back
Next
civil engineering
JSR Construction has expanded to deliver civil engineering projects, and has the capability to provide a range of sustainable, high quality and innovative solutions in the specialisms of roads, car parks, foundations, drainage, sewers, earthworks, groundworks and demolition.
case studies
Click images for more information:
Roads, car parks, foundations, drainage, water attenuation, sewers, earthworks, groundworks and demolition
Powered by Camelot Media Ltd
Telephone: 01746 862786

Mobile: 07973 924730

Email: john@jsrconstruction.co.uk
Email: enquiries@jsrconstruction.co.uk
JSR Construction
Hill Farm
Chelmarsh
Bridgnorth
Shropshire
WV16 6AX